*What may be built where — and which guarantees protect you in a new build? Land classification, building permits, coastal law and developer guarantees.*
Balearic urban-planning law Ley 12/2017 de Urbanismo de les Illes Balears (LUIB).
| Land | Meaning |
|---|---|
suelo urbano | developed/serviced urban land — buildable |
suelo urbanizable | development land (buildable in the future) |
suelo rústico común | rural, limited building rights (with a permit) |
suelo rústico protegido | specially protected (ANEI/ARIP/ANIT/AANP) — barely/not buildable |
solar = building-ready urban plot (all servicing requirements met).rústico — minimum plot size (parcela mínima) by category (PTIM): 14,000 m²in AIA / AT-H / SRG; 50,000 m² in ARIP and SRG-F (forestry); in ANEI, AANP, ARIP-B, APT residential new construction is prohibited ✅ (🔎 no "20 ha"/"200,000 m²" — simply a ban). Usually only 1 dwelling per plot. 🟡 Edge case Palma: a municipal increase to up to 100,000 m² has been discussed/adopted (Palma only).
ocupación) max. 3 % of the plot (SRG) or 2 % (ARIP);total dwelling volume 🟡 max. ~1,500 m³. 🔴 Specific setbacks (retranqueos)/heights vary by PTIM + municipality — do not generalise.
declaración de interés general (DIG, Ley 6/1997): preliminary step for non-agriculturaluses; application to the Ayuntamiento → declaration by the Consell, información pública 15 days, total deadline ~3 months.
ANEI (natural area of special interest), ARIP (rural landscape protection), ANIT, AANP — basis Ley 1/1991 (LEN). EU protection: Red Natura 2000 (LIC/ZEC, ZEPA). Heritage protection: BIC (Bien de Interés Cultural), municipal catálogo. Serra de Tramuntana: UNESCO World Heritage (since 2011) + ANEI → strictest building requirements.
dominio público marítimo-terrestre (DPMT): public coastal strip that cannot be privatised— use only by concession (concesión administrativa).
servidumbre de protección: building/use restriction on private land: 100 m from the shoreline(rule), 20 m in areas that were suelo urbano before 1 January 1988.
servidumbre de tránsito: 6 m passage strip to be kept clear.zona de influencia: at least 500 m (new buildings must blend in).deslinde: official demarcation of the DPMT boundary.licencia de obra mayor (major building permit): prior municipal approval for new construction andall works that require a technical project (LOE) (Art. 146 LUIB).
licencia de obra menor / comunicación previa: simple works without a project requirement(Art. 148).
declaración responsable de obras: self-declaration, immediate start, control a posteriori.proyecto básico (for the permit) vs. proyecto de ejecución (execution design;🟡 to be submitted within ~6 months, Art. 152). visado by the architects' association COAIB.
licencia de segregación/agrupación (division/merger) — very sensitive on rústico;illegal parcellations are null and void.
cambio de uso (e.g. local → vivienda): obra mayor + project + then cédula.ITE (Inspección Técnica de Edificios) / IEE: mandatory inspection of older buildings(🟡 thresholds 30/50 years, municipal; in Palma ITE from 50 years, every 10 years).
piscina) on rústico: 🟡 max. 1 per finca, water surface ≤ 35 m², volume ≤ 60 m³.placas): self-consumption on rústico permitted, often an IBI rebate (depends on the municipality).compra sobre plano (purchase off-plan): buyer protection hinges on the **mandatory guarantee fordeposits**.
aval bancario / seguro de cantidades anticipadas ✅: mandatory — the developer mustsecure the instalments paid (+ interest) (Disp. adic. 1ª Ley 38/1999 as amended by Ley 20/2015); payments into a special account. Do not pay any instalment without a valid aval.
seguro decenal (10-year structural cover) ✅ mandatory; trienal (3 yrs habitability) and anual(1 yr execution) 🟡 not necessarily insured, but liability under Art. 17 LOE still applies.
certificado final de obra (CFO) (architect + building technician) + **licencia de primera ocupación** = prerequisite for utilities, obra-nueva registration and release of the aval.
libro del edificio (building book, Art. 7 LOE).silencio administrativo ✅#The municipality must decide on the licencia urbanística within 3 months (Art. 151 LUIB). Important: For new construction (as well as earthworks and parcellations) the silencio is negative (rejection) — positive silencio is only the general rule with major exceptions, and never against the spatial planning. proyecto de ejecución: the municipality reviews for 1 month (Art. 152, amended by DL 3/2024).
deslinde (demarcation of the DPMT boundary): decision within 24 months; if part of thefinca falls within the DPMT, the owner loses ownership there and receives a concession. Costas exposure has been registrable in the Land Registry since 2013/2015 — check it.
concesión administrativa: term max. 75 years, transferable **only withadministrative approval. The buyer of a concession property does not acquire full ownership**, but a time-limited right — central to valuation/financing.
May I build on a finca plot on Mallorca? Only under strict conditions: minimum plot size (14,000–50,000 m²), usually only one house, observing protected zones (ANEI/ARIP). On protected rústico, new construction is effectively ruled out.
What protects me when buying a new-build apartment from a developer? The statutory deposit guarantee (aval/seguro de cantidades anticipadas, Ley 38/1999 + Ley 20/2015) and the seguro decenal. Do not pay a deposit without a valid guarantee.